Build the shortlist around depalletising, filling, seaming and downstream packing. Ask for operating evidence and a clear list of the can-format equipment included.
- Which can sizes and seamer tooling are included?
- What seam-quality checks and production-run records are available?
Prepare interfaces for a canning installation
Map can transfers, accumulation and pack-out alongside product and cleaning supplies. Verify the destination layout and handling equipment. Keep seamer tooling, format changes and commissioning checks in the project scope so they are not left until the first production run.
Plan before dismantling
Document layout, cable and pipe routes, reference points, software backups, alignment and the sequence needed for reassembly.
Protect every component
Define cleaning, preservation, labelling, packing, lifting points, transport frames and environmental protection for the journey.
Prepare the destination
Confirm utilities, foundations, access, safety compliance, integration, commissioning resources and acceptance criteria.