A used canning line that runs a standard can today may need a different set of parts to run a slim can. Before pricing the change, ask the seller to identify the installed parts, the spares that come with the machine and the exact can and end that the current recipe has run. Package names help you start the conversation. The supplier drawings and a trial with your samples are what let you close it.
Prepare the two formats
For each format, collect the can body and end references, drawing revisions, body diameter and overall height, the end specification, and the final pack configuration. Request unopened sample lots that can be traced back to those drawings. Keep ends in their original labelled sleeves. If the approved sample for the trial is undecorated, record any later label or sleeve that will affect clearances or inspection. Crown’s range shows why it matters to specify the can family and the exact size separately. Crown beverage can range
Change-part register to copy into your request
| Station or handoff | Slim format | Standard format | Verification to request |
|---|---|---|---|
| Depalletiser and rinser | ___ | ___ | Can transfer, guide contact and can orientation |
| Filler infeed and discharge | ___ | ___ | Infeed parts, supports and stable transfer through both formats |
| End feed and seamer | ___ | ___ | End specification, tooling references and a recorded seam evaluation for each package |
| Inspector and reject | ___ | ___ | Recipe, sample disposition and evidence that rejection is confirmed |
| Tray, film or carton pack-out | ___ | ___ | Pack count, stability and handoff to the next machine |
Agree how the changeover will be timed
Record the last accepted standard can, the time needed for the authorised change and the first accepted slim pack. Ask how long the new format must run at the agreed rate, what the operator may adjust during the trial, and how you will log stops and rejected samples. If you plan to switch back in the same shift, agree a reverse trial too. A repeat run on the second shift best represents the staffing you plan to use.
Have the can and end suppliers and your quality lead agree the seam evaluation and acceptance criteria for the drawings in the trial. If the seller only demonstrates one format, record each unverified station and agree whether its parts and proof are included in the offer. Read the guide to used seamer tooling records
Discuss a line for both formats
Once the slim format runs steadily, use the guide to canning-line output units to compare its good-can count with the standard format over an equivalent test window.
Send the two can and end references, your target cans per minute and the pack-out format. Include the asset reference if you already have a machine in mind. Contact Used Canning Lines